1. Home
  2. /Documents
  3. /RAMS — risk assessments & method statements
92 RAMS

RAMS — risk assessments & method statements

Risk assessment and method statement (RAMS) documents for construction activities, written for your job: scope, persons at risk, hazards with likelihood × severity scores, control measures, PPE, a step-by-step method and a sign-off sheet.

Site Establishment and Set Up RAMS

Hoarding, welfare, services, signage, storage, security.

Traffic Management RAMS

Vehicle/pedestrian segregation, deliveries, banksmen, public highway interface.

Soft Strip RAMS

Non-structural strip-out, asbestos R&D survey, services isolation, manual handling.

Demolition RAMS

Structural demolition, exclusion zones, BS 6187, plant, dust, services.

Excavation and Earthworks RAMS

Trench support, services (CAT/genny), collapse, plant/pedestrian, inspections.

Below Ground Drainage RAMS

Trenches, pipe laying, manholes, confined space awareness, testing.

Foundations and Substructure RAMS

Concrete foundations, reinforcement, formwork, pumping, cement burns.

Trench Electrical Mains RAMS

Ducting, cable pulling, live services, DNO coordination.

Steel Reinforcement Fixing RAMS

Rebar handling, cutting, impalement, manual handling.

Formwork and Falsework RAMS

Erection/striking, temporary works, loads, falls.

Concrete Placement and Finishing RAMS

Pours, pumps, vibration, cement dermatitis, power floats.

Structural Steelwork RAMS

Erection, lifting, bolting, working at height, BCSA guidance.

Brickwork and Blockwork RAMS

Masonry, mortar, cutting (silica), scaffolds, manual handling.

Scaffolding RAMS

TG20/SG4 erection, alteration, inspection and dismantling.

Mobile Access Equipment RAMS

MEWPs, towers (PASMA), podiums, ground conditions, rescue.

Flat Roofing RAMS

Membranes, hot works/torch-on, edge protection, fire watch.

Pitched Roofing RAMS

Tiling/slating, battens, edge protection, fragile surfaces.

Roof Waterproofing RAMS

Liquid/hot applied systems, COSHH, edge protection.

External Rendering RAMS

Render systems, scaffold, dust, COSHH, weather.

External Wall Insulation and Cladding RAMS

EWI/cladding installation, fire, scaffold, cutting.

Window, Door and Glazing RAMS

Glazing handling, suction lifters, falls, cuts.

Mechanical Services RAMS

Pipework, plant, pressure testing, hot works, working at height.

Electrical Services RAMS

Isolation, live working prohibition, testing, cable management.

Plumbing and Above Ground Drainage RAMS

Pipework, solvent cements, hot works, testing.

Drylining and Partitions RAMS

Board handling, screw guns, dust, working at height.

Plastering and Skimming RAMS

Mixing, dermatitis, dust, stilts/hop-ups.

Floor Screeding RAMS

Pumped/hand screed, cement, manual handling, drying.

Wall and Floor Tiling RAMS

Cutting (silica), adhesives, kneeling, dust.

Carpentry and Joinery RAMS

Power tools, wood dust, first/second fix, manual handling.

Floor Finishes RAMS

Vinyl/carpet/timber, adhesives, knives, kneeling.

Painting and Decorating RAMS

COSHH, ventilation, ladders/steps, sanding dust.

Insulation RAMS

Mineral wool/PIR handling, fibres, cutting, confined roof voids.

Passive Fire Protection RAMS

Fire stopping, sealants, third-party accreditation, records.

Working at Height (General) RAMS

Hierarchy of control, ladders, edge protection, fragile roofs.

Lifting Operations RAMS

LOLER lift plan, AP/crane supervisor, exclusion zones.

Manual and Material Handling RAMS

TILE assessment, mechanical aids, team lifts.

Temporary Works / Propping RAMS

BS 5975, TWC, design, permit to load/strike.

Site Cleaning and Housekeeping RAMS

Waste, sharps, slips/trips, dust suppression.

Waste Management RAMS

Segregation, skips, duty of care, hazardous waste.

Mobile Plant and Dumper RAMS

CPCS/NPORS, seatbelts, overturn, pedestrians.

External Works and Hard Landscaping RAMS

Paving, kerbs, cutting, plant, services.

Soft Landscaping RAMS

Planting, topsoil, machinery, manual handling, weather.

Asbestos — Non-Licensed and NNLW Work RAMS

CAR 2012 Reg 3(2); R&D survey, task-specific plan, Category B training, controlled wetting, Class H vac, FFP3 / face-fit, disposable coveralls, decontamination, double-bagging, hazardous waste consignment, notification for NNLW, medicals.

Piling and Ground Improvement RAMS

Piling mat design and certificate (BRE 470), rig stability, exclusion zones, cage lifting, auger spoil, noise / vibration monitoring, services, open bores, concrete pumping.

Timber Frame Erection RAMS

Panel lifting with crane, erection sequence, temporary bracing, edge protection and crash decks / airbags, fire risk during construction (STA guidance), weather, fixing guns.

Precast Concrete and Hollowcore Installation RAMS

Crane lifts to lifting plan, bearing checks, temporary propping, edge protection / nets, grouting, access on unstable units, exclusion zones, delivery sequencing.

Curtain Walling and Façade Panels RAMS

Glass / panel handling with vacuum lifters and cranes, MEWP / mast climber access, brackets and fixings to structure, exclusion zones below, weather and wind limits, sealants.

Structural Alterations — Openings and Temporary Support RAMS

Engineer's design and sequence, needling / Acrow propping, Strongboys, temporary works checks, cutting and breaking out, dust, lintel / beam installation, loading of existing structure, monitoring for movement.

Diamond Drilling and Concrete Cutting RAMS

Scanning for rebar / post-tension / services, slurry control, water and electrical safety, HAVS, noise, anchoring the rig, cores falling, permit to drill in structural elements.

Welding, Hot Cutting and Brazing RAMS

Hot works permit, fire watch 60 min, gas cylinder storage and flashback arrestors, welding fume LEV / RPE (HSE: all welding fume is carcinogenic), arc eye screens, electrical safety.

Confined Space Working RAMS

Confined Spaces Regs 1997: avoid entry, safe system, atmosphere testing, forced ventilation, top man, communications, rescue plan and equipment, trained entrants, permit to enter.

Hoists and Loading Bays RAMS

Passenger / goods hoist installation and thorough examination, gates and interlocks, landing gates at loading bays, edge protection, overloading, operator training, pallet gates.

Rope Access and Suspended Access (Cradles / BMU) RAMS

IRATA / BS 7985, two-rope system, anchor testing, exclusion zones below, dropped objects, weather limits, cradle thorough examination, rescue plan.

Balconies and Balustrades RAMS

Bolt-on balcony lifts, temporary edge protection during installation, glass balustrade handling, fixings to design, fall-arrest, exclusion zones below, load testing.

Suspended Ceilings RAMS

Podium / tower access, grid installation, hanger fixings into soffit (drilling dust), tile handling, services coordination, cutting mineral fibre tiles, falling objects.

Kitchen and Bathroom Fit-Out RAMS

Unit and worktop handling, isolation of water and electrics, sanitaryware, tiling and grout dust, adhesives and sealants, occupied property protection, waste packaging.

Fire Alarm and Emergency Lighting RAMS

BS 5839 / BS 5266 installation, working at height, cable containment drilling, isolation of existing systems with fire watch, testing and commissioning, battery handling.

Sprinklers and Fire Suppression RAMS

Pipework installation at height, pipe handling, grooved / threaded joints, hydrostatic pressure testing, water damage, tank and pump room work, commissioning.

Ventilation and MVHR — Installation and Commissioning RAMS

Ductwork and unit installation at height, loft / ceiling void access, fibre insulation, electrical connection, airflow testing and balancing to Part F, commissioning records.

Solar PV and Roof-Mounted Equipment RAMS

Roof access and edge protection, fragile roof surfaces, panel handling and wind, DC electrical hazard (panels live in daylight), inverter installation, MCS commissioning.

Lift Installation RAMS

Lift shaft access, open landings protection, shaft screens, lifting of motor and car components, electrical isolation, LOLER examination, handover to lift engineer.

Roads, Kerbs, Paving and Surfacing RAMS

Plant and pedestrian interface, kerb lifting (vacuum lifter / manual handling), hot asphalt burns and fume, cutting dust, traffic management, compaction plant HAVS.

Fencing and Hoarding RAMS

Hoarding panel installation and wind loading design, post holes and buried services, public protection, gate installation, manual handling, power tools.

Pressure Testing and Commissioning of Pipework RAMS

Test method (hydrostatic preferred over pneumatic), test pressures and gauges, exclusion zones, stored energy, water disposal, test certificates.

Electrical Testing and Commissioning RAMS

BS 7671 inspection and testing, live working prohibited unless justified (EAWR Reg 14), isolation and lock-off, test equipment (GS38), energisation procedure, certification.

Mastic, Sealants and Firestopping RAMS

Access at height, sealant COSHH (isocyanates / silicones), gun handling, firestopping to tested details, labelling and records, occupied areas.

Snagging, Remedials and Final Handover RAMS

Multi-trade minor works in completed areas, protection of finishes, access equipment, dust and tools in occupied / handed-over areas, sign-off and handover records.

Gas Installation and Pipework RAMS

Gas Safe registered engineers only, isolation and purging, tightness testing, hot works for soldering / brazing, ventilation, CO risk, meter and emergency control valve, certification.

Heat Pumps, Boilers and Heating Systems RAMS

Air / ground source heat pump and boiler installation, heavy unit lifting, refrigerant handling (F-Gas certified), electrical connection, pressure testing, flue and condensate, commissioning.

Underfloor Heating RAMS

Manifold and pipe installation, kneeling and manual handling, pressure testing before screed, coordination with screeders, electrical mats (isolation), protection of pipework.

Data, Telecoms and Low Voltage Systems RAMS

Cable containment at height, ceiling void access, drilling dust, fibre optic safety (eye protection, glass shards), cabinet installation, working near live LV / mains cables.

Access Control, CCTV and Security Systems RAMS

Door hardware and maglocks, camera installation at height, cabling, fire alarm interface, live building / occupied areas, commissioning and handover.

EV Charging Points RAMS

Groundworks for ducts and bases, cable pulling, isolation and live working controls, BS 7671 Section 722, OZEV / DNO notification, testing and commissioning.

Steel Staircases and Secondary Steelwork RAMS

Crane or hoist lifting, temporary fixing and propping, bolting and welding at height, edge protection at stair voids, handrail installation, torque checks.

Timber Stairs, Handrails and Balustrading RAMS

Stair delivery and handling through the building, protecting open stairwells, fixing to structure, cutting / machining dust, temporary handrails until permanent fitted.

Fire Door Installation RAMS

Certified doorsets to manufacturer instructions, ironmongery, intumescent seals, gaps tolerances, handling heavy doors, labelling and installation records (Fire Safety (England) Regs 2022).

Resin Flooring and Floor Coatings RAMS

Substrate preparation by grinding / shot blasting (dust, noise), epoxy / PU resins (sensitisers, isocyanates), ventilation, flammable vapour, curing and access control.

Rooflights and Roof Lanterns RAMS

Fragile openings and edge protection, lifting glazed units, fall prevention during installation, sealing and flashing, working on flat roofs, weather limits.

Green and Blue Roofs RAMS

Loading materials onto roof (crane / hoist), substrate and planting, water attenuation layers, edge protection, manual handling of bags, irrigation.

Gutters, Fascias and Soffits RAMS

Scaffold / MEWP access at eaves, removal of old materials (possible asbestos in soffits), cutting uPVC / aluminium, falling objects, public protection below.

Post-Fixed Anchors and Anchor Testing RAMS

Chemical and mechanical anchors to BS 8539, drilling dust and RCS, resin COSHH, embedment and cure times, pull-out testing and records, installer competence.

Underpinning RAMS

Engineer's sequence (hit-and-miss bays), excavation support beneath existing foundations, confined working, monitoring for movement, concrete placement and dry-packing.

Retaining Walls and Gabions RAMS

Excavation stability, temporary works, block / gabion basket filling with plant, drainage behind the wall, working at height on wall faces, backfilling and compaction.

Site Clearance and Tree Works RAMS

Vegetation clearance, chainsaw work by certificated operators, felling exclusion zones, nesting birds / ecology checks, chipper safety, stump grinding.

Invasive Species Treatment (Japanese Knotweed) RAMS

Specialist contractor, herbicide application (COSHH, PA certificates), excavation and controlled waste, root barrier, biosecurity of plant and footwear, records.

Dewatering and Over-Pumping RAMS

Pumps and wellpoints, electrical safety near water, fuel and noise, discharge consent, silt control, excavation stability as water level drops, 24-hour monitoring.

Sewer Connections and Work in Manholes RAMS

Adoption / water company approval, confined space entry, sewer gases (H2S), Weil's disease, over-pumping, traffic management, CCTV survey.

Surveying and Setting Out RAMS

Working near plant and open excavations, edge of slabs, traffic, instrument tripod stability, lone working, working in live roads.

Façade Cleaning and Pressure Washing RAMS

Access (MEWP / rope / scaffold), high-pressure water injection injury, chemical cleaners, slip hazards, run-off control, electrical safety.

Masonry Repair, Repointing and Stone Restoration RAMS

Raking out (dust / silica), lime mortar, scaffold access, stone lifting, cutting, HAVS, heritage consents, chemical cleaning.

Temporary Electrical Supplies RAMS

BS 7375 / BS 7671, DNO supply, distribution boards and 110V transformers, RCDs, cable routes and protection, inspection and testing schedule, isolation.

Drainage CCTV Survey and Jetting RAMS

High-pressure jetting (injection injury, 3-person rule), confined spaces, biological hazards, traffic management, CCTV crawler handling, waste water disposal.

Site Docs Pro documents are drafted to CDM 2015 and current HSE guidance for the project you describe. They are templates for a competent person to review, adopt and sign.