RAMS, permits & site safety documents for UK construction

Describe the job.
Get the whole pack.

Site Docs Pro writes your RAMS, permits, forms, briefings, toolbox talks and COSHH assessments for the project in front of you — and puts your logo on every page, not ours.

No app store download Word + PDF 253 document types Set up in 2 minutes
YOUR LOGO
SITE RAMS
CL1-YOU-RAMS-014
Issue 1.0 · Sep 2026
RAMS 14
Scaffolding — Erection, Alteration & Dismantling
Erecting, altering, inspecting and dismantling tube-and-fitting and system scaffold at Caldecotte Lake, Building 1, by competent CISRS scaffolders.
Principal ContractorYour Company Ltd
Project / SiteCaldecotte Lake B1, MK7
Prepared byA. Site Manager
Review dateSep 2027 or on change
Part C — Risk Assessment
#HazardWhoControl measuresRisk
1Falls from height during erectionScaffolders▪ SG4 collective protection; advance guardrail▪ Harness clipped at all times above 2 m2×5=10
2Scaffold collapse or overloadAll users▪ Built to TG20 / design; ties & bracing checked▪ Load class posted; no stacking on lifts2×5=10
3Falling tubes, fittings, toolsOperatives & public▪ Exclusion zone below; brick guards▪ Tool tethers; gin wheel rope checked2×4=8
4Manual handling of componentsScaffolders▪ Team lifts; mechanical hoist over 25 kg3×2=6
Part D — PPE & Equipment
Hard hatHarness + lanyardHi-visSafety bootsGlovesScaffold key & tether
Part E — Method Statement
1Set-up and exclusion. Barrier the drop zone, place sole boards and base plates, check ground bearing.
2Erect the first lift. Level standards, fix ledgers and transoms, fit advance guardrail before boarding.
3Progress upward. Ladder access within the bay; tie in at every second lift as per design.
4Handover and tag. Competent inspection, Scafftag issued, entry in the register before use.
Prepared
Approved
Briefed to team
Your Company Ltd · Co. No. 12345678 · CDM Principal ContractorIssue 1.0 · Page 1 of 4
CDM 2015 HSG150 · HSG185 Work at Height Regs COSHH PUWER · LOLER RIDDOR
Features

Made for a site manager, not a safety consultant.

Enter the job once. Everything else is written, branded and filed for you.

Written for the job, not copied

Every RAMS, permit and plan is drafted for your project's scope, site and people — hazards, controls and method steps included, to CDM 2015 and HSE guidance.

Your logo. Your colour. Your name.

Upload a logo, pick a colour, enter your details once. Every page carries your company in the masthead and the footer — not ours.

253 documents in 7 packs

Management docs, 92 RAMS, permits, forms & registers, briefings, toolbox talks and COSHH — plus bespoke documents for anything else.

Edit anything, see it live

A structured editor for every field with a live PDF preview beside it. Change a control measure and watch the page update.

Word and PDF twins

Download .docx to edit in Word, PDF to send to site, or the whole pack as one ZIP in numbered folders — ready for the client or the HSE.

Yours to review and sign

Documents are templates for a competent person to check, adopt and sign. Mark them issued, keep issue numbers, regenerate when the scope changes.

How it works

Three steps from a blank folder to a full pack.

Most packs are written in the time it takes to make a tea.

01

Set up your company

Name, company number, address, logo and colour. Once. It goes on every page of every document from then on.

02

Describe the project

Client, address, scope of works, who's on site, nearest A&E and assembly point. Tick the trades, permits and substances that apply.

03

Generate and export

One button writes every missing document. Read, tweak, mark issued, then download Word, PDF or the whole pack as a ZIP.

Your brand

It looks like it came from you. Because it did.

Site Docs Pro ships with no logo and no company name. Yours is the only brand a client, a principal designer or an inspector will ever see.

  • Your logo in the masthead of every page — or your company name in bold if you'd rather not use one
  • Your colour on rules, eyebrows, bullets and callouts; your dark colour on headings and table headers
  • Your company number, role and email in the footer, with issue number and page X of Y
  • Your company code in every reference, by project: CL1-ACME-RAMS-014, CL1-ACME-PTW-003…
YOUR LOGO
SITE RAMS
CL1-YOU-RAMS-014
Issue 1.0 · Sep 2026
RAMS 14
Scaffolding — Erection, Alteration & Dismantling
Erecting, altering, inspecting and dismantling tube-and-fitting and system scaffold at Caldecotte Lake, Building 1, by competent CISRS scaffolders.
Principal ContractorYour Company Ltd
Project / SiteCaldecotte Lake B1, MK7
Prepared byA. Site Manager
Review dateSep 2027 or on change
Part C — Risk Assessment
#HazardWhoControl measuresRisk
1Falls from height during erectionScaffolders▪ SG4 collective protection; advance guardrail▪ Harness clipped at all times above 2 m2×5=10
2Scaffold collapse or overloadAll users▪ Built to TG20 / design; ties & bracing checked▪ Load class posted; no stacking on lifts2×5=10
3Falling tubes, fittings, toolsOperatives & public▪ Exclusion zone below; brick guards▪ Tool tethers; gin wheel rope checked2×4=8
4Manual handling of componentsScaffolders▪ Team lifts; mechanical hoist over 25 kg3×2=6
Part D — PPE & Equipment
Hard hatHarness + lanyardHi-visSafety bootsGlovesScaffold key & tether
Part E — Method Statement
1Set-up and exclusion. Barrier the drop zone, place sole boards and base plates, check ground bearing.
2Erect the first lift. Level standards, fix ledgers and transoms, fit advance guardrail before boarding.
3Progress upward. Ladder access within the bay; tie in at every second lift as per design.
4Handover and tag. Competent inspection, Scafftag issued, entry in the register before use.
Prepared
Approved
Briefed to team
Your Company Ltd · Co. No. 12345678 · CDM Principal ContractorIssue 1.0 · Page 1 of 4
Pick your colour Orange
What it writes

253 standard documents. Plus anything bespoke.

Tick the ones that apply to the job; the rest of the pack is always included.

Management Documents

20

Construction Phase Plan, policies and site-wide plans.

Construction Phase Plan · Health and Safety Policy · Site Rules · Fire and Emergency Plan · First Aid Needs Assessment · Site Waste Management Plan · …

See all 20

Risk Assessments & Method Statements

92

One RAMS per activity — tick the trades on this project.

Site Establishment and Set Up · Traffic Management · Soft Strip · Demolition · Excavation and Earthworks · Below Ground Drainage · …

See all 92

Permits to Work

14

Controlled-activity permits — tick the ones this project needs.

Permit to Work (General) · Excavation / Dig Permit · Hot Works Permit · Working at Height Permit · Confined Space Entry Permit · Electrical Isolation Permit · …

See all 14

Forms & Registers

27

Blank site records, inspections and registers.

Accident / Incident Report · Near Miss and Hazard Report · Toolbox Talk Record · Daily Site Inspection · Scaffold Inspection Register · Excavation Inspection Record · …

See all 27

H&S Briefings

34

One-page briefings delivered at induction and refreshed on site.

Site Rules and Conduct · Emergency Procedures and Evacuation · First Aid Arrangements · PPE Requirements · Accident and Near Miss Reporting · Manual Handling · …

See all 34

Toolbox Talks

50

Short talks for the supervisor to deliver — with key points and questions to ask.

Slips, Trips and Falls · Safe Use of Ladders and Stepladders · Abrasive Wheels and Cutting · Dust and Silica · Hand-Arm Vibration (HAVS) · Asbestos Awareness · …

See all 50

COSHH Assessments

16

Substance-specific assessments — tick the substances used on this project.

Cement and Cement-Based Products · Respirable Crystalline Silica · Diesel and Fuels · Solvent-Based Paints and Primers · Adhesives, Sealants and Resins · Bitumen and Hot-Applied Products · …

See all 16

Bespoke documents

A RAMS for an unusual activity, a site-specific permit, a one-off plan — name it, brief it, and it is written in the same style.

Pricing

Less than a consultant's first phone call.

Your first 3 documents are free — no card. Then subscribe, or pay only for what you generate. Editing, downloads and exports never cost anything.

Free trial
£0
3 documents, no card
  • Every document type
  • Your logo and colour
  • Word + PDF downloads
Start free
Most popular
Pro
£49.99/ month inc. VAT
or £399 a year
  • Up to 150 documents a month
  • Whole packs in one click
  • Rewrite with instructions
  • Bespoke documents of any type
  • Cancel any time
Go Pro
Pay as you go
£18/ 10 documents
or 50 for £58 — about a full pack
  • Credits never expire
  • No subscription needed
  • Tops up a Pro plan too
Buy credits
FAQ

Straight answers.

Do I need to install anything?

No. Site Docs Pro runs in the browser on any laptop, tablet or phone. Sign in, set up your company and start a project.

How much does it cost?

Your first 3 documents are free, no card needed. After that it is £49.99 a month or £399 a year for Pro (up to 150 documents a month), or buy credits as you go: 10 documents for £18, 50 for £58. Credits never expire. Editing, downloads and exports are always free.

Whose branding is on the documents?

Yours. Upload your logo, enter your company number, address and contact details, choose a colour. The masthead and footer of every page carry your company.

What does it actually write?

Risk assessments & method statements for 92 activities, 14 permits to work, 27 forms and registers, 34 one-page briefings, 50 toolbox talks, 16 COSHH assessments and 20 management documents including the Construction Phase Plan — all written for the project you describe. Anything else, ask for a bespoke document.

Are the documents ready to issue?

They are drafted to CDM 2015 and current HSE guidance and are specific to your scope, but they are templates for a competent person to review, adopt and sign — not a substitute for your own judgement on site.

Can I edit them?

Yes — every field in the app with a live preview, and the Word file in Word afterwards. Or tell the app what to change and have it rewritten.

Where is my data stored?

In a UK-hosted (London) database tied to your account. Your logo and company details are stored once and applied to every document.

Write your next pack the easy way.

Set up your company, describe the job, press one button.