Construction management documents

The site-wide documents every CDM 2015 project needs: the Construction Phase Plan, policies, site rules, emergency, traffic, waste and environmental plans — written for your project and branded with your logo.

Construction Phase Plan

CDM 2015 Regulation 12 CPP: project particulars, management arrangements, site rules, welfare, significant risks and controls, emergency procedures, document register.

Health and Safety Policy

Statement of intent, organisation and responsibilities, arrangements. Signed by the director.

Site Rules

Clear, numbered site rules covering access, PPE, conduct, plant, welfare, permits, environment.

Fire and Emergency Plan

Fire prevention, means of escape, alarm, assembly point, fire-fighting equipment, roles, emergency contacts, drills.

First Aid Needs Assessment

Assessment per HSE guidance: hazards, headcount, first-aider numbers, kit locations, nearest A&E.

Site Waste Management Plan

Waste streams forecast, segregation, duty of care, licensed carriers, transfer notes, targets, hazardous waste (asbestos, oils).

Traffic Management Plan

Vehicle routes, pedestrian segregation, deliveries, banksman arrangements, signage, speed limits, reversing, public interface.

Site Induction Briefing

The induction every person receives: site layout, rules, emergency, welfare, permits, RAMS, reporting, PPE, environmental.

Environmental Management Plan

Noise, dust, vibration, water/pollution, ecology, working hours, nuisance, spill response, monitoring.

Temporary Works Register and Procedure

BS 5975 approach: TWC/TWS roles, register of temporary works items with category, design check, permit to load/strike.

Asbestos Management Plan (Refurbishment)

CAR 2012 / HSG264: review of the R&D survey, register of ACMs in the work area, permit-to-strip process, discovery-of-suspect-material procedure, licensed vs non-licensed vs NNLW work, air monitoring and clearance certification, training (Category A/B), records.

Lifting Plan

LOLER / BS 7121: appointed person, lift categorisation, crane / equipment selection, ground bearing, exclusion zones, slinging and signalling, weather limits, lift supervisor, emergency and rescue; include a lift schedule table.

Emergency Rescue Plan

Rescue from height (harness suspension, MEWP, scaffold), confined spaces and excavations: rescue team, equipment, drills, communication, time targets, first aid, liaison with emergency services.

Site Logistics Plan

Access and egress, deliveries booking and hours, storage and laydown, crane/hoist positions, pedestrian and vehicle routes, welfare, waste areas, neighbours, parking; describe a logistics layout in words.

Dust, Noise and Vibration Management Plan

Neighbour and occupant protection: working hours, Section 61 / BS 5228 limits, monitoring locations and triggers, dust suppression, complaints procedure, communication with residents.

Health Surveillance Programme

Who needs it (HAVS, noise, respiratory sensitisers, dermatitis, silica, night work), occupational health provider, tiered HAVS assessment, audiometry, lung function, skin checks, records and fitness decisions.

Drugs and Alcohol Policy

Zero-tolerance statement, for-cause / random / post-incident testing, prescription medicine disclosure, support and rehabilitation, disciplinary process, confidentiality, contractors.

Subcontractor Management Procedure

Pre-qualification (SSIP / PAS 91), RAMS review and approval, induction, monitoring and inspections, performance review, non-conformance, CDM duties flow-down.

Occupied Building Working Plan

Works in occupied / live residential or commercial buildings: segregation, resident communication, vulnerable persons, fire strategy and escape routes maintained, security, noise / dust hours, out-of-hours working, cleanliness.

Temporary Services and Welfare Plan

Welfare to CDM Schedule 2: toilets, washing, drying rooms, canteen, drinking water, temporary electrics (BS 7671/BS 7375), water, lighting, maintenance and cleaning regime.