1. Home
  2. /Documents
  3. /RAMS — risk assessments & method statements
  4. /Below Ground Drainage
RAMS — risk assessments & method statements

Below Ground Drainage RAMS

A RAMS for below Ground Drainage, written by Site Docs Pro for the project you describe — your site, your scope, your people — and branded with your company logo, colours and details. Download it as an editable Word file or a PDF ready to issue.

What it covers

Trenches, pipe laying, manholes, confined space awareness, testing.

What's included

  • Part A — document and project details: reference, principal contractor, site, client, prepared by, review date
  • Part B — scope of works, persons at risk and the risk rating method
  • Part C — risk assessment: each hazard, who is at risk, control measures and likelihood × severity score
  • Part D — PPE and equipment
  • Part E — step-by-step method statement
  • Part F — sign-off and briefing record for everyone who reads it

How it works

  1. 1Set up your company once: logo, colour, company number and contact details.
  2. 2Describe the project: site, client, scope and the activities involved.
  3. 3Press Generate — the RAMS is written for your job in about a minute.
  4. 4Review and edit any field with a live preview, then download Word or PDF.

Drafted to CDM 2015 and current HSE guidance. Like any template, it is for a competent person to review, adopt and sign before use.