- Home
- /Documents
- /RAMS — risk assessments & method statements
- /Carpentry and Joinery
RAMS — risk assessments & method statements
Carpentry and Joinery RAMS
A RAMS for carpentry and Joinery, written by Site Docs Pro for the project you describe — your site, your scope, your people — and branded with your company logo, colours and details. Download it as an editable Word file or a PDF ready to issue.
What it covers
Power tools, wood dust, first/second fix, manual handling.
What's included
- Part A — document and project details: reference, principal contractor, site, client, prepared by, review date
- Part B — scope of works, persons at risk and the risk rating method
- Part C — risk assessment: each hazard, who is at risk, control measures and likelihood × severity score
- Part D — PPE and equipment
- Part E — step-by-step method statement
- Part F — sign-off and briefing record for everyone who reads it
How it works
- 1Set up your company once: logo, colour, company number and contact details.
- 2Describe the project: site, client, scope and the activities involved.
- 3Press Generate — the RAMS is written for your job in about a minute.
- 4Review and edit any field with a live preview, then download Word or PDF.
Drafted to CDM 2015 and current HSE guidance. Like any template, it is for a competent person to review, adopt and sign before use.