Permits to work
Permit to work forms for high-risk activities — hot works, confined spaces, excavations, electrical isolation and more — with pre-start checks, precautions and issue, acceptance and cancellation signatures.
Permit to Work (General)
Excavation / Dig Permit
Hot Works Permit
Working at Height Permit
Confined Space Entry Permit
Electrical Isolation Permit
Roof Access Permit
Lifting Operations Permit
Temporary Works Permit
Fire Alarm Isolation Permit
Zones / devices isolated, reason, duration, fire watch or alternative cover, building manager / ARC notified, reinstatement and test sign-off.
Asbestos Permit to Strip
R&D survey reference and review, area confirmed clear of ACMs or ACMs removed with clearance certificate, stop-and-report procedure, authorisation to start strip-out.
Pressure Testing Permit
System / section, test medium and pressure, exclusion zone, gauges calibrated, isolations, test result record, depressurisation and hand-back.
Out-of-Hours and Lone Working Permit
Hours, persons, tasks allowed, check-in times and method, first aid and emergency cover, security, site access, sign-in/sign-out.
Permit to Drill or Core Structure
Structural engineer's approval, scanning for rebar / post-tension tendons / services, hole schedule, sleeves and firestopping, sign-off.
Site Docs Pro documents are drafted to CDM 2015 and current HSE guidance for the project you describe. They are templates for a competent person to review, adopt and sign.