- Home
- /Documents
- /Construction management documents
- /Subcontractor Management Procedure
Construction management documents
Subcontractor Management Procedure
A document for subcontractor Management Procedure, written by Site Docs Pro for the project you describe — your site, your scope, your people — and branded with your company logo, colours and details. Download it as an editable Word file or a PDF ready to issue.
What it covers
Pre-qualification (SSIP / PAS 91), RAMS review and approval, induction, monitoring and inspections, performance review, non-conformance, CDM duties flow-down.
What's included
- Your logo, reference and issue on every page
- Clear sections written for your project and site
- Key points and responsibilities in plain English
- A record or sign-off section where one is needed
How it works
- 1Set up your company once: logo, colour, company number and contact details.
- 2Describe the project: site, client, scope and the activities involved.
- 3Press Generate — the document is written for your job in about a minute.
- 4Review and edit any field with a live preview, then download Word or PDF.
Drafted to CDM 2015 and current HSE guidance. Like any template, it is for a competent person to review, adopt and sign before use.